Requirements

This client was in the process of a major refurbishment at their busy recycling depot. A quick solution was required to store some of their recycling products prior to sorting. The building needed to allow for easy access for oversized vehicles operate freely within the structure.

Solution

HTS Clear Span Structure Systems manufactured and installed a 20.00m x 15.00m Canopy structure on a 6.20m eave height, using 40mm UPVC steel reinforced walling panels combined with a single layer PVC roof system.
The HTS Clear Span Structure Systems team installed the canopy structure within 3 days on the client’s busy site, causing minimal disruption to the operation whilst their refurbishment was taken place – the building will remain on site for a period of 24 month on a long term temporary warehouse rental basis.