Requirements

Tripoli International Airport wanted to expand its arrival hall, so they turned to HTS Clear Span Structure Systems to provide a customised airport terminal within a very short period of time.
The existing infrastructure needed to be improved due to increasing passenger numbers.

Solution

HTS Clear Span Structure Systems already had the specialist knowledge and manufacturing expertise to be able to realise a large, customer specific project such as this within a limited time frame. The customised constructions for which the company are renowned worldwide are manufactured in an ultra-modern, 64,000 m² production facility in Germany.
The decision makers at the airport chose HTS Clear Span Structure Systems for this project because they were impressed with the level of service offered, the specialist knowledge offered by the team and the response they received during the initial enquiry phase. In addition, they were impressed with the quality of the products and the company’s proven ability in handling customised projects.
The fully-insulated building designed, manufactured and supplied to the airport in Tripoli was 50.00m wide, 100.00m long and had a multi-peak roof design with an eave height of 6m. The building was also delivered with all the necessary equipment and accessories that a fully-functioning airport would need.
The airport terminal was delivered and erected within a very short period of time. The unique and contemporary multi-peak roof design also modernises the feel of the entire airport complex.

Enquire about this product