Requirements

Our client a global electronics and electrical engineering company required a temporary warehouse building for a fixed rental period of 18 months during the construction phase of a new wind turbine assembly and storage facility in Belfast.

Solution

HTS Clear Span Structure Systems Solution:
The client needed a temporary warehouse building solution within a matter of 3 weeks. To facilitate this urgent request, HTS Clear Span Structure Systems re-deployed a temporary warehouse building that had just returned from a long term rental that fitted their exact size requirements. After a short factory inspection and cleaning of the covers, the temporary building was dispatched and installed within a matter 21 days from the date of order.

The customer was extremely satisfied with the overall final solution provided, the speed of response combined with minimal site disruption to their busy site operations.